Hi,
We are currently testing the migration from BPC 7.0 to 10.0. During the processing of the time dimension the error occured that the Base_period property is missing in the dimension sheet. In the help documentation it is said that the Base_period property is generated during migration for environments with a Monthnum property. Although the Time dimension had the Monthnum property, the Base_period property was not generated automatically.
Is this generally a problem? Should this work properly or is it a bug?
We have added the Base_period property now manually to see if the processing is successful. This worked, but how does this now affect the system? There are logics and reports created with the Monthnum property used in formulas. Would these work properly, when the Base_period property would have been generated automatically? Or can we use Base_period property and Monthnum property side by side?
Thanks a lot.
Melanie